成人国产精品麻豆入口,亚洲在线一区国产,国产精品久久久精,四虎成人精品在永久免费

揚(yáng)州天源電器有限公司
點(diǎn)擊這里給我發(fā)消息
揚(yáng)州天源電器有限公司
Home About us Products News Honor Job Message Contact us
還沒(méi)有任何的內(nèi)容
Yangzhou Tianyuan Electrical Co.,Ltd.
Add:No. 8 Hongyang Road, Hanjiang District, Yangzhou City, Jiangsu Province
Tel:0514-87780609
Fax:0514-87780509
Mail:YZTY609@sina.com
    You are here: Home >> News-Load isolation switch mounting points
Load isolation switch mounting points
  The publisher:admin Release time:2012/12/4 Read:277Secondary

This paper mainly discusses some problems about load isolation switch installation. Earlier encounter products HGL series load isolation switch cabinet installation need schematic, later in the installation process, there are some small problems, so here is a little summary, hope for those in the installation load isolation switch problems can have certain help and inspiration.

We know, load isolation switch can pass off the load current, but not breaking short circuit current, short circuit fault is have the aid of and its series fuse protection. Load isolation switch and the isolating switch with the same apparent disconnect interval, so it can also play a role in isolated power supply. This and another common switch knife switch is not the same.

In general, load isolation switch isolation switch installation and installation of roughly the same, but in the regulation of time, pay attention to the following points:

( 1) load isolation switch of the main blade and the auxiliary blade action sequence should be: closing the auxiliary blade to closure, a main blade after closed; when opening a main blade disconnect, disconnected after auxiliary blade.

( 2) separate switch, the blade open distance should be consistent with the manufacturing plant, such as not up to the requirements, can change the operating rod in a fan-shaped plate in position, or adjust the length of the pull rod.

( 3) in the switching of the main blade has a small plug, closing should be just inserted into the arc extinguishing device of spray nozzle. Operation when the nozzle should not fierce collision, otherwise should handle.

( 4) if the installation of the load switch with fuse, before installation should check the fuse current rating is in accordance with design, installation of fuse tube should be tightly into the jaw.

Personally think that, third point and fourth point in particular need attention, can avoid many unnecessary trouble. Of course, and any of a class of product installation, installation load isolation switch problems far more than these, but generally only in accordance with the operation process, is not a big problem.


  • Previous news:

  • Next news:
  •  
    Copyright 2012-2015 Yangzhou Tianyuan Electrical Co.,Ltd. All Rights Reserved
    Add:No. 8 Hongyang Road, Hanjiang District, Yangzhou City, Jiangsu Province Tel:0514-87780609 Fax:0514-87780509 Mail:YZTY609@sina.com